Finish line

I finished the three baby quilts yesterday and got them mailed.  I crossed the finish line at the post office when I handed over the package.  Yay! I was so busy yesterday afternoon doing things unrelated to sewing, it was like a reward for binding those three quilts in the morning.  I thought I was done sewing for the day, but I made myself work on the Frolic pieces.  I sewed “just one more” until I was done with all the cut pieces I had.  Im about 2/3rds done with clue 7.  Hard to believe I have been working on this quilt for seven weeks.  I think I average two weeks for a top finish, a little less for smaller ones a little more for larger.B809CCCB-DD46-44C5-9EDE-C3D9E6E8EB8C_1_201_a

All my block parts/pieces are in this zippered bag, funny how this is a queen sized quilt in a gallon sized bag.

@0@0

Or 2020.  I’ve been busy this past week.  In my spare time I’ve been scrolling blogs and admiring the to-to lists, the UFO lists, the best of lists, the must do lists, and the recaps.  Lists, lists and more lists.  I think I did a list post a week or so ago, 2020 Aspirations  yep.  Then I started sewing the four baby quilts, the Bonnie Hunter Mystery, the Live Simply quilt and Mrs. Millers Apprentice.

I got the baby girl quilts quilted, there were two, as one of the babies turned out to be a boy, and I had already made a “girl colored” top.  I was able to fit two across on the long arm and quilt them together.  Just to make it interesting, I used two different pantos, daisies and hearts & bubbles.  The blue quilts are on the frame, waiting to make/finish one more top.

My Frolic pieces are coming together, the sneaky 1/1/20 clue threw a wrench into my keeping up routine.  I have been trying to make 10 sets a day (40 Geese) which is manageable, but I have not started Clue 7 yet.  There seems to be a lot of sets of 41, so I’m thinking 41 blocks.  But she always has a pieced border, or maybe she’s doing medallion style this year? Usually she does on point settings, although Good Fortune wasn’t, was it?Soon we’ll know.

The Live Simply, the amish inspired/colored quilt is webbed and the borders are pieced.  It’s hanging on the design wall, not too pretty at the moment.  I’m auditioning quilting pattens in my head.  Thinking all over feathers, or feathers to go in the cabins. F1BD198D-81EF-401A-AE3D-2F1499BDF999

Last on the to-do list is Mrs. Miller,  I am upset with myself about this top.  I was so careful in putting it together, it’s an on point setting with HST’s setting squares in a diamond pattern.  I did misplace one, near the center, but otherwise everything was going the right direction and in the right place.  Then I noticed the blue triangles were made from two different fabrics.  They are the same shades, but one has flowers and the other has dingle berries  cherries.  These are not where they are supposed to be, there is an inner diamond of one type and an outer diamond of the other.  There were many expletives uttered when I held up the top for a look.  I webbed this top, so I unstitched all the columns and now I’m going to lay it out and remove/replace any blocks not in their right row/spot.  Needless to say the missus is in timeout for a while.

That wraps up week one of this year, only 51 more to go.

 

Organized Chaos

I walked past my sewing room today and was amazed at the mess of it.  It is a big mess of projects, fabric, bins and boxes of fabric, piles of fabric, rulers, papers/patterns, and…more fabrics.  I am working on three main projects right now, Mrs. Millers Apprentice, Live Simply and Frolic.  All are large and all are in various states of done-ness.  I am at the put-together stage of MMA, all the blocks are done, the setting blocks are done too.  The borders need to be cut, but I can’t do that until the main body is sewn together.  I also need 88 more 3-triangle blocks to do one of the outer borders.  Yesterday I worked on months 10 and 11, today I want to get the center part together.  It’s sort of a mini quilt, using nine, 3 1/2 inch blocks that were made each month.  The background story of this quilt is Mrs. Miller (farmers wife) teaches her neighbor’s daughter to sew.  These little blocks are supposed to represent her work.  I like the blues and tans of this quilt, it is one I am making for me.

42993086-6E77-4A7F-A02F-E83D03FAAD46

Mrs Miller’s Apprentice

The Frolic pieces are coming together too, although I am a bit low on Aqua colored scraps.  I was forced to buy/order more fabric to alleviate this deficit.  While looking through my current stock of scraps for more aqua, I came across a large bag of mixed solid scraps.  They had fallen behind some other piles and had been quietly multiplying themselves for the past few years.  These scraps are from my Amish with a Twist 2 quilt (circa 2015),  I think if I combine them with the scraps from my Gravity quilt and the Live Simply quilt, I’d have enough for a bed size quilt. The colors are compatible in “real life”, what I have in mind is similar to this leader ender quilt that KatyQuilts is making.  I am hoping all the jewel tones will sparkle and shine, AND there will be three less bags of scraps.

I have a scrappy top made from 2 ½ inch squares, from Wedding Dress Blue called Growing Up Odd.  I thought I had a picture of it, but not on this computer.  Not sure if I want to do something with the sashing strips or just go free range squares.

This is my design wall today, it is the least chaotic area in my room today.

Linking up with Judy at Small Quilts and Doll Quilts for Design Wall Monday.  She has a post about finding calm in December.  I think I need to read it now.

 

2020 Aspirations

End of the year compilations are starting to appear on some of the Quilter’s blogs I follow.  I am impressed with the amount of finishes, but also the numbers of UFO’s (completed and resting).  I’m trying to get a list together of what I want to accomplish next year.  I get stymied though, it’s like an avalanche of images that crashes in my mind.  Too much input.  I’m going to start small, how about January goals:

  1. Frolic
  2. Mrs. Millers Apprentice
  3. Live Simply (log cabin)
  4. 4 Baby quilts – commissions
  5. Finish peppermint poinsettia quilting
  6. Quilt Feathered star

That’s easier.  Goals for the next six months, rather general:

  1. Quilt tops that were completed last year, and before
  2. Keep on top of current BOM, Botanica Park
  3. Start wedding quilt (sept. wedding)
  4. One UFO from Last List 
  5. Construct quilt kits bought in 2019

Number four is the list from last January, I got one of them finished.  There are still three from that list will be included in Number 1.  Looking back on that post there were also some other 2019 goals:

  1. Work on To-Be-Quilted Pile
  2. List/Sell More Quilts in Shops
  3. Design and Make Applique quilt
  4. Use Stash
  5. Make BOM’s
  6. Explore Social Media, Blog

I accomplished All except 3 and 6.  Although I did design quite a few quilts including “Sew She Did”, but the appliqué masterpiece is still just an idea.  Then there’s number 6, I can’t seem to make the leap to social media promotion.  I resist FB postings, although there are a few people that I follow, I just don’t have the enthusiasm nor the follow through to properly use it to my advantage.  Yep, that’s it in a nutshell.  Finally, what about using up stash and quilt kits?  This is going to be a priority this year for me.  I’ll be interested in how this all turns out next year.😁  

 Other Quilty accomplishments from 2019:

  1. PIQF/RD2CA quilt “Sew She Did”
  2. Finished Christmas Fig BOM top
  3. I finished 30+ quilts
  4. I Donated a bunch of quilts
  5. Sold a bunch of quilts

 

That’s all I have for today, I’m going to print this and hang it where I can review it, with regularity.

prefab

On my design wall today are log cabins, these are for the Live Simply quilt.  I spent last week cutting, and cutting all the pieces.  I did it in a very organized way, and separated each color way, size and final destination (block or border).  Four different flat boxes, that can be stacked and relocated easily.  It has been quite helpful in the construction, as I only have to pull out 5 strip sets at a time.  I then sew nine blocks, assembly line style, together.  It takes about 75 minutes to do nine.  I have 56 blocks to make and 27 done so far, I want to get another set done today. Friday another clue for “Frolic” comes out, so I’d like to have room for that to happen.

I have fallen behind on Mrs. Miller, the BOM I am doing for 2019.  The last month should be arriving today or tomorrow. I have two (ten blocks) sets left to make and the last installment is the borders and finishing instructions, I’m not sure if there are more blocks though.  I want to get this top together soon, because I signed up for another BOM that starts 1/15/20.  It’s called Botanica Park, a Wing and a Prayer design, all batiks, medallion style.  You may remember the Forest Floor pattern quilt I made by them.

 

It’s a big (107″ square) quilt too. I’ll be busy with these four projects for the next few months.  Oh yeah, and an order for four more baby quilts.

Linking up with Denise at For the Love of Geese for Put you foot down #31 today.